CETSTalk to an engineerContact
Menu
All industries

Data centres

Follow power to the rack.

A total on the main incomer cannot tell you which PDU is approaching capacity. Branch monitoring helps operators see how load moves as equipment comes online.

Server racks line both sides of a data centre aisle.
Measurement priorities

Start at the load.

Engineering support

What are you measuring?

Bring us your single-line diagram, meter schedule or site question.

Talk to an engineer