A power monitoring checklist for Singapore manufacturers
Define the reporting boundary, identify significant loads and keep a traceable record of the energy used on site.
Check which site qualifies
Singapore’s Energy Conservation Act covers qualifying industrial activities. For an existing facility, NEA considers a business activity at a single site under a corporation’s operational control. The threshold is at least 54 terajoules of energy in each of two or more of the previous three calendar years. Count the energy sources used by the activity, including fuels as well as electricity.
Manufacturing and related services are among the covered sectors. A corporation has six months to register once it qualifies. Registered corporations appoint an energy manager, report energy use and greenhouse gas emissions annually, and prepare an annual improvement plan. NEA also sets requirements for energy management systems, assessments and record keeping.
Draw the measurement boundary
Start with the site plan, the single line electrical diagram and the energy bills for the same period. Mark each incoming supply. List the fuel and other energy records held outside the electricity monitoring system. Where a supply serves more than one activity, document how the team allocates it.
Choose the first measurement points
- At the incomer, keep a site total that the team can reconcile with billed consumption.
- At large loads such as chillers, compressors and production lines, record energy over the same intervals as the site total.
- For each meter, record the feeder name, units, current transformer ratio, time zone and who owns the data.
Test a month of readings
Compare the change in each cumulative energy register with the interval totals. Inspect missing periods, meter replacements and resets. Check that a downstream feeder has not also been counted in its parent total. Keep a note of each correction so a second person can reproduce the result.
Build the reporting record
Keep the source readings alongside the calculation, the current meter schedule and the explanation for any estimates. For an efficiency project, log its commissioning date and the production hours or output used for comparison. Schedule the internal review ahead of the 30 June deadline for the annual energy use report and improvement plan.